At every turnover
- □Walk every room and photograph current condition
- □Test locks, latches, windows, doors, and entry hardware
- □Check visible plumbing fixtures, shutoffs, drains, and supply connections
- □Test installed smoke and carbon monoxide devices
- □Inspect walls, ceilings, trim, flooring, cabinets, and appliances
- □Review exterior entry, lighting, steps, rails, and trip hazards
- □Create a prioritized make-ready punch list before scheduling work
- □Complete a final quality-control walk before resident move-in
